玩彩平台

  • <tr id='tsSnVT'><strong id='tsSnVT'></strong><small id='tsSnVT'></small><button id='tsSnVT'></button><li id='tsSnVT'><noscript id='tsSnVT'><big id='tsSnVT'></big><dt id='tsSnVT'></dt></noscript></li></tr><ol id='tsSnVT'><option id='tsSnVT'><table id='tsSnVT'><blockquote id='tsSnVT'><tbody id='tsSnVT'></tbody></blockquote></table></option></ol><u id='tsSnVT'></u><kbd id='tsSnVT'><kbd id='tsSnVT'></kbd></kbd>

    <code id='tsSnVT'><strong id='tsSnVT'></strong></code>

    <fieldset id='tsSnVT'></fieldset>
          <span id='tsSnVT'></span>

              <ins id='tsSnVT'></ins>
              <acronym id='tsSnVT'><em id='tsSnVT'></em><td id='tsSnVT'><div id='tsSnVT'></div></td></acronym><address id='tsSnVT'><big id='tsSnVT'><big id='tsSnVT'></big><legend id='tsSnVT'></legend></big></address>

              <i id='tsSnVT'><div id='tsSnVT'><ins id='tsSnVT'></ins></div></i>
              <i id='tsSnVT'></i>
            1. <dl id='tsSnVT'></dl>
              1. <blockquote id='tsSnVT'><q id='tsSnVT'><noscript id='tsSnVT'></noscript><dt id='tsSnVT'></dt></q></blockquote><noframes id='tsSnVT'><i id='tsSnVT'></i>
                 
                13835631999
                0356-6967868

                球墨铸铁管沟槽开挖与验收

                发布时间:2018-07-28 17:15 | 编辑:山西悦瀚铸管 | 76 次浏览
                球墨铸铁管沟槽开挖与验收1、测量放线 在挖槽时,由测量人员埋设坡度板,给水管道一般每隔20m设置一块状排水管道每隔10m设置一块。若遇有阀门、消火栓、三通、检查井等处增设坡度板。坡度板之间中心钉连线即为管道轴线位置,坡度板之间高程钉的连线即为管内底的平行坡度线。安管时,从坡度线上取一下反常数,垂直放入管内底中心处,即可控制管道高程。2、沟槽开挖 沟槽断面形式:常用沟槽断面形式有直槽、梯形槽、混合槽...

                球墨铸铁管沟槽开挖与验收



                1、测量放线

                        在挖槽时,由测量人员埋设坡度板,给水管道一般每隔20m设置一块状排水管道每隔10m设置一块。若遇有阀门、消火栓、三通、检查井等处增设坡度板。坡度板之间中心钉连线即为管道轴线位置,坡度板之间高程钉的连线即为管内底的平行坡度线。安管时,从坡度线上取一下反常数,垂直放入管内底中心处,即可控制管道高程。

                2、沟槽开挖

                        沟槽断面形式:常用沟槽断面形式有直槽、梯形槽、混合槽等等。合理选择沟槽断面形式,可以为管道安装创造便利〓作业条件,保证施工安全,减少土方量的开挖,加快施工进度。选定沟槽断面应考虑以下因素:土壤的种类、沟管断面尺寸、水文地质条件、施工方法和管道埋深等因素。




                1, measuring line

                        When digging the trench, the slope plate is buried by the surveyor, and a piece of drainage pipe is generally set every 10m for the water supply pipe every 20m. If there are valves, fire hydrants, tees, inspection wells, etc., add gradient plates. The center nail connection between the gradient plates is the position of the pipeline axis, and the line connecting the elevation nails between the gradient plates is the parallel slope line of the bottom of the pipe. When controlling the tube, take the anti-constant from the slope line and put it vertically into the center of the tube bottom to control the tube elevation.


                2, trench excavation

                        Groove section form: Commonly used groove sections have straight grooves, trapezoidal grooves, and mixing grooves. Reasonably selecting the groove section form can create convenient working conditions for pipeline installation, ensure construction safety, reduce excavation of earthwork volume, and accelerate construction progress. The following factors should be taken into consideration when selecting the section of the trench: the type of soil, the size of the trench, the hydrogeological conditions, the construction method and the depth of the pipeline.


                销售经理微信二维码.jpg

                微信销售经理

                山西悦瀚网站.jpg

                公司网站


                山西悦瀚球墨铸管

                主营业务:球墨铸管、球墨管件、柔性管、井盖。

                增值服务:方案解决、技术支援等。



                山西第二大球墨铸铁管、球墨管件、井盖、柔性管生产企业ζ :

                http://www.guanxiconnect.com

                (声明:文章来源于网络,不代表本站观点及立场,版权归原作者所有,若有侵权或异议请联系更正或删除)

                相关文章

                     球墨铸管
                    联系我们
                山西悦瀚球墨■铸管有限公司
                联系人:朱元基

                电话:13835631999

                          0356-6967868

                地址:山西省晋城市城区白水街南、黄华街东(方程国际商业服务楼1幢16层1908号)
                客户案例
                快速导航: